T. 01905 622 113

Renovation - for a brighter floor future

Renovation - for a brighter floor future

The Sports and Hall floors we encounter in Schools often have not been maintained for many years. This gives a wooden floor a bare and dull appearance. Often these floors have scratches, have faded lines and also become very slippery. An inspection and assessment of the floor can give you more insight into this aspect. Renovation is a costly but sustainable investment, which is a major advantage for a wooden floor !

Our specialists first carry out a thorough inspection of your floor. Their findings are then presented in a clear report. Further action can be taken on the basis of these findings and a detailed quotation is provided for any work that is needed with a guide on how you should approach maintenance after the floor has been renovated.

You can schedule an appointment with us for an inspection to be carried out. We would like to draw your attention to the fact that the time frames for renovating a wooden sports floor are very limited. Usually this is done during the school holiday periods.

We recently renovated the Granwood tile Sports hall floor and the wood strip Gymnasium and Hall floors at Higham Lane High School. All floors were sanded back to bare wood/ Granwood tile to give a fresh start before sealing with Granguard seal for the Granwood floor and Bona SuperSport/ Bona HD Traffic for the Gymnasium/ School Hall floors as they are the recommended and in our opinion the best quality lacquers available.

Martin McCracken was in charge of the project and we met with him to inspect the floors, quote for the work needed and advise on maintenance after the floors were renovated. Here is what Martin, the Estates Manager had to say:

A very friendly family run business who can not do enough to help and advise. The workforce are all efficient, polite and hard working ensuring a quick turn around but with a quality finish.

Martin@ Higham Lane School

The floors in these rooms give an important first impression of the school as they are often the areas used for important days and for hire to the community. The Gymnasium and School hall were old floors in quite poor condition as you can see below.

IMG 0157 IMG 0665

After renovation the Granwood Sports hall, Wooden Gymnasium and School Hall (incl stage) are like new:

IMG 0611 IMG 0654 2 PHOTO 2024 01 03 14 02 48 3

Category: Sports floor maintenance